Camp Horizon Tour

“See what the Lord has done.”

Chapel

Chapel Construction

The chapel was built when Stan Shields (Barb) was director and Karl Rudzitis was maintenance mgr.

1991 Corporate Meeting: “Why we need a separate chapel building.

The chapel was ready for the summer of 1993.

Scanner
Chapel in the Dining Hall
1976-1992

The dining hall was divided with a removeable wall. Meals were on the end near the Craft Shed. Chapel was on the Big Field end.

Until the gymnasium was built (1997), this also served as the only indoor venue for rainy day games.

Imagine playing Murder Ball (1980s Camp Horizon version of Dodge Ball) in the Dining Hall!